532cc7ea63
I wanted to get this up next day but I kept falling asleep before finishing what I wanted to About The Pull Request Fixes some issues that have been brought to my attention with smart cables Closes #44768 Closes #44775 Why It's Good For The Game this shit pretty broke as is in game. Changelog cl fix: removed mech rcl from the research node so it stops spamming a warning in log fix: cables now disconnect machines when cut fix: terminal linking/not linking behavior with smeses has been improved fix: couple of small mapping fixes tweak: changed cable coils back to 30 tweak: changed the box smes room a little to prevent stacking terminals tweak: removed the rpcl from engineering on every map because it's not used for wiring anymore /cl